YOU ARE HERE Service & knowledge
Case Study Packaging 12 percent less downtime

Case Study: 12% less downtime in packaging

Anonymized practice: A multi-lane packaging line had regular micro-stops due to manual lubrication and uneven quantity distribution. After converting to one Central lubrication system With monitoring, downtimes decreased measurably.

Initial situation

  • Inconsistent lubrication, high cleaning effort
  • Missing feedback (no sensors)
  • Lubricant consumption above plan

Solution

  • Progressive distributor with stroke sensor & pressure monitoring
  • Interval control (process-dependent) and trends in the HMI
  • Change the medium to the appropriate oil/grease for each zone

Results (6 months)

  • −12 % downtime
  • −18 % Lubricant consumption
  • +9 % OEE on the line

Lessons learned

  • Clean data (pressure/stroke/flow) drastically shortens troubleshooting
  • Medium choice and intervals are levers for consumption and cleanliness
  • Regular trend reviews prevent creeping deviations

Similar goals Request a short consultation è Components: Distributor, Control & monitoring

Back to the blog
Back to the blog